Ge Breaker Wiring Diagram
Assortment of ge shunt trip breaker wiring diagram.
Ge breaker wiring diagram. This circuit breaker wiring diagram illustrates installing a 20 amp circuit breaker for a 240 volt circuit. A wiring diagram is a simplified standard pictorial depiction of an electric circuit. It shows the elements of the circuit as simplified shapes as well as the power as well as signal connections in between the gadgets. Low voltage power circuit breakers types ak 50 75 100 akt 50 aku 50 an d akf 2c 2d 2e gek 7303 created date.
It shows the parts of the circuit as simplified forms and also the power and also signal links in between the tools. April 3 2019 by larry a. Some window air conditioners dehumidifiers compact refrigerators and small countertop microwaves do not have wiring diagrams. A neutral wire is not used in this circuit.
2 geh 2000 magne blast circuit breaker type am 4 16 1. The 12 2 gauge cable for this circuit includes 2 conductors and 1 ground. A wiring diagram is a streamlined standard photographic representation of an electrical circuit. The diagram may be mailed or e mailed.
Types ak 2 2a ak 2 3 2a 3a shunt trip device. Breaker closing speed three cycle maximum closing speed at nominal voltage is. Ge shunt trip breaker wiring diagram. The white wire is used for hot in this circuit and it is marked with black tape on both ends to identify it as such.
Power break ii circuit breakers basic configuration in 1965 ge pioneered the design of insulated case circuit breakers when it introduced the original power break circuit. Opening spring unit s. Wiring diagram book a1 15 b1 b2 16 18 b3 a2 b1 b3 15 supply voltage 16 18 l m h 2 levels b2 l1 f u 1 460 v f u 2 l2 l3 gnd h1 h3 h2 h4 f u 3 x1a f u 4 f u 5 x2a r power on optional x1 x2115 v. If you cannot locate your wiring diagram you can call the appliances answer center with your complete model number.
Wellborn variety of ge powermark gold load center wiring diagram. Wiring diagram secondary terminals. You can reach us by dialing 1. Of the wiring diagram energizes the coil of the.
L3 circuit breaker stop start m ot t1 t2 t3 m m solid state overload relay 1ct m m motor 3ct to 120 v separate control ot is a switch that opens. Shunt trip circuit breakers can be used to automatically disconnect a install the breaker in the panel and wire up the three phases to the three.